SECURE FACILITY · PROJECT READINESS
Free · No sign-in · Result before any contact details

Are you ready to start
a secure facility project?

Answer planning-level questions about the requirement, the schedule, the space, the building, the technical scope, the people and the paperwork. You get back a readiness picture: what is already in place, what is missing before construction should begin, who has not been brought in yet, what evidence has not been started, and the order to work in. No verdict, no figure, no gate.

I.THE PROBLEM

Nobody tells you what has to be true before you build.

A secure facility project is not mainly a construction project. It is a set of conditions that have to be true at the same time: a requirement somebody outside your organization owns, a space that can physically carry the construction, technical standards named by the authority that will inspect the result, a set of people who have to be in the room, and a record that will still make sense to a reviewer two years from now.

Most teams discover those conditions one at a time, in the order that the project happens to surface them, which is almost never the order that would have been cheapest. By the time the gap appears, the lease is signed, the drawings are done, or the walls are closed.

II.WHAT USUALLY GOES WRONG

The same handful of gaps, in the same order.

III.WHAT YOU NEED TO KNOW

Seven things a project is checked against.

These are the areas the tool below asks about. They are the same areas a competent reviewer walks through on a first call, and none of them require anything sensitive to answer.

IV.CHECK YOUR READINESS

Answer what you know. Skip what you do not.

The picture below updates as you answer and is produced entirely in your browser. Nothing is transmitted, and unanswered questions are reported as open rather than guessed at.

Do not enter classified facility details. Planning-level inputs only.

Initializing intake …

›YOUR PROJECT READINESS PICTURE
V.WHAT SALIAN DOES

One accountable line across the secure environment.

A · SCOPE
Turn a requirement into a project

Salian works the requirement back to what it implies: the space that can carry it, the technical elements it actually needs, the sequence, and a budgetary range. Where the blocker is a facility clearance rather than a building, Salian helps you identify and prepare for the sponsorship path.

B · DESIGN AND BUILD
ICD-705 design, construction, preparation for accreditation

SCIFs and SAPFs designed and built to ICD-705 and the current technical specifications, and closed areas to the NISPOM. Fixed facilities, or modular and mobile units through cleared partners. Where the requirement calls for shielding or acoustic performance, it is designed, installed and verified by measurement. You get the test records, not a promise.

C · THE PACKAGE
Prepared as the project runs, not at the end

The construction security plan, the drawing set, the fixed facility checklist, certifications, test and commissioning records are assembled while they are being created. Salian coordinates with the AO/CSA and stays in the room for the review. See how SCIF accreditation works.

D · AFTER
Sustainment, and recovery

Re-inspections, configuration changes and the day-to-day that keeps a facility in good standing. Salian also steps into stalled or partially built efforts and finds what is missing before proposing a way forward.

VI.WHAT SALIAN DOES NOT CONTROL

The determinations belong to the government.

The applicable Accrediting Official or Cognizant Security Authority accredits the facility. Salian scopes, designs, builds, prepares the accreditation package and coordinates with the AO/CSA, and carries a facility to accreditation. It does not accredit, and neither does any other contractor.

This tool is planning support. It is not a determination by any of those authorities, and no answer you give here changes what one of them will decide.

VII.WHAT HAPPENS NEXT

Three ways this usually goes.

VIII.COMMON QUESTIONS
What does this tool actually tell me?

It compares your answers against the dependencies an ICD-705 secure facility project normally has to satisfy before construction starts, and returns four lists and a sequence: dependencies already in place, dependencies missing before construction should begin, stakeholders your answers say are not yet engaged, and evidence not yet started. It does not return a verdict, a figure or a decision. The judgement stays with you.

Do I have to give you my email to see the result?

No. The picture is produced in your browser as you answer, and nothing is transmitted. Sending a summary to Salian Defense is a separate, optional step at the bottom of the result that requires an explicit consent check.

What information should I not put into this tool?

Do not enter classified facility details. Planning-level inputs only. Nothing here asks for the location, configuration or as-built specifics of an accredited space, for the contents of a DD-254, or for controlled unclassified information, and none of that should be entered.

Does every secure facility need RF shielding, acoustic protection and intrusion detection?

No. Not every project needs every element. What a given facility requires is set by the applicable Accrediting Official or Cognizant Security Authority against the mission and the handling requirement. A project that selects fewer technical elements is not an incomplete project, it is usually a cheaper one, and assuming requirements nobody has named is one of the most common sources of avoidable cost.

Do I need a facility clearance before starting?

A facility clearance and a facility accreditation are different things, decided by different authorities, and neither is a prerequisite for planning. A facility clearance requires a sponsor with a bona fide classified requirement. Salian helps you identify and prepare for the sponsorship path, and DCSA or the applicable Cognizant Security Agency makes the determination. To see where you stand, use the free five-gate readiness check or the FCL Navigator.

What happens if I send my summary to Salian?

A Salian Defense program manager reviews the summary and contacts you at the email you provided to arrange a call. On that call you get a read on feasibility and sequence. Nothing in the intake is binding, and nothing is stored unless you check the consent box.

IX.SOURCES

What the questions are drawn from.

The dependency areas above follow the structure of the governing documents for accredited space and the security requirement that drives them. Requirements for a specific facility come from the applicable AO/CSA, not from this page.

Citations are to the governing documents by name. Access to some of these is controlled; your security officer or the AO/CSA is the right route to the current text.

X.TALK TO SALIAN
/ NEXT STEP

Bring the project as it is, not as it should look.

Stalled builds, an unsigned lease, a requirement that arrived after award, a facility that did not survive its inspection: those are the normal starting points, not the embarrassing ones. Tell us what you are trying to accomplish and we will tell you which problem it actually is.