SCIF accreditation is the formal approval of a facility for classified processing by the cognizant Accrediting Official, based on ICD-705, the Fixed Facility Checklist, and the body of evidence. Salian Defense assembles the package and walks it through the AO directly, so the facility is ready to sign, not handed over with a wish of good luck.

›DIRECT ANSWER
/ ANSWER CAPSULE

What is SCIF accreditation?

SCIF accreditation is the formal approval of a facility to process, store, or discuss Sensitive Compartmented Information, granted by the cognizant Accrediting Official (AO) based on ICD-705, the Fixed Facility Checklist, and the body of evidence. Accreditation means the AO has determined the facility meets the physical and technical standards for the protection level it will host.

The contractor's security requirements flow from the contract and the DD-254, within the authority of the Cognizant Security Authority (CSA). Salian Defense assembles the evidence and works the package with the AO directly, then sustains the accreditation for the life of the program.

I.THE PROCESS

The accreditation process, step by step.

Accreditation is earned across the build, not at the end of it. The table below maps each step to who owns it and what it produces, so the body of evidence is complete and defensible when the AO inspects the space.

SCIF accreditation process: steps, owners, and outputs
StepWhat happensPrimary output
1. Requirement and authority Identify the cognizant AO or CSA, the protection level, and the security requirements that flow from the contract and DD-254. Confirmed authority and protection level
2. Concept approval Submit the design and Construction Security Plan for AO concept approval before construction begins. Approved concept and CSP
3. Construction security Build under construction security oversight, install sound attenuation, and where required install and test RF and TEMPEST shielding. Compliant as-built space, test results
4. Body of evidence Complete the Fixed Facility Checklist and assemble drawings, IDS and access-control documentation, and the CSP record. Fixed Facility Checklist package
5. Inspection and sign-off The AO inspects against ICD-705, resolves findings, establishes co-use agreements where needed, and grants accreditation. Accreditation and any co-use memorandum
6. Maintain Sustain through self-inspections, configuration management, and re-accreditation as the facility or its use changes. Continued accreditation

Steps overlap in practice and the specific roles vary by Cognizant Security Authority. Standards and process are general; nothing on this page is program-specific.

II.WHAT THE AO EXAMINES

What accreditation turns on.

A · CONSTRUCTION
Physical construction

Wall, floor, and ceiling assemblies, doors, and penetrations built to ICD-705 so the perimeter resists surreptitious and forced entry to the standard the protection level requires.

B · ACOUSTIC
Sound attenuation

Acoustic protection to the required Sound Group so that classified discussion is not audible outside the perimeter. Amplified-sound areas carry a higher standard than normal-conversation areas.

C · DETECTION
Intrusion detection and access

Intrusion detection systems, access control, and alarm response documented and tested. Closed-storage facilities carry stricter detection and response requirements than working spaces.

D · EMISSIONS
TEMPEST and RF, where required

Where the threat assessment calls for it, TEMPEST countermeasures and RF shielding are installed and verified by measurement, and the test results join the body of evidence.

III.THE PROBLEM

Construction complete is not accreditation ready.

Two projects share the same site. One ends when the walls close. The other ends when someone can show how every part of that space was built, tested and protected while it was being built. Only the first is visible on a walkthrough.

The second project lives in the as-built drawing set, the test records, the product certifications, a Construction Security Plan that was actually followed, and a Fixed Facility Checklist that describes the space as it exists rather than as it was drawn. When a facility program runs out of money or patience, it is almost always because the second project was never put on the schedule.

The practical consequence is that the last stretch of a secure facility project is rarely construction. It is reconciliation: matching what was built to what was drawn, working out who witnessed which test, and re-establishing contact with an authority that has not heard from the project in a year.

What usually goes wrong

A · SEQUENCE
Evidence started after the walls closed

Penetrations, backing, wall assemblies and cable pathways stop being observable the moment they are covered. Reconstructing that record afterwards costs more than capturing it as it happened, and it convinces fewer people.

B · DRIFT
The as-built drifted from the drawings

Substituted hardware, a relocated door, a rerouted conduit. Each is defensible on its own and none of them reach the drawing set. The submission then describes a facility that does not exist.

C · SILENCE
The authority hears about it at the end

A project that coordinates with the AO/CSA once at the beginning and once at the end has spent the whole middle guessing. Late coordination is recoverable. Late coordination that hides what happened is not.

D · TESTING
Installed treated as tested

An intrusion detection system that is mounted, an access control head end that is powered, shielding that is up: none of that is a test result. A test has a witness, a date, and a document that survives the project.

E · OWNERSHIP
Nobody owned the CSP or the FFC

The Construction Security Plan and the Fixed Facility Checklist belong to the project rather than to a trade, which is exactly how they end up belonging to nobody. Both need a named owner in the first week.

F · UNSETTLED
The TEMPEST and RF question stayed open

Whether these requirements apply is an answer the AO/CSA gives in writing, including when the answer is that they do not apply. Left open, it blocks design decisions that a great deal of other work depends on.

What you need to know before you check

IV.CHECK YOUR READINESS

Are you actually ready for accreditation?

Sixteen planning-level questions across four areas. Answer yes, no, or not sure. What comes back is a picture in five lines you can take into your own project meeting: where construction stands, what the evidence package is missing, what still has to be tested, what still has to be coordinated, and who holds the determination.

Input rule. Do not enter classified facility details. Planning-level inputs only. Your answers stay in this browser unless you choose to send them.

The applicable Accrediting Official or Cognizant Security Authority accredits the facility. Salian prepares, builds, tests, documents and coordinates.

V.ROLES

What Salian does, and what Salian does not control.

A · WHAT SALIAN DOES
Prepare, build, test, document, coordinate

Salian prepares the package, builds or corrects the space, arranges and witnesses the testing, writes the record, and coordinates with the AO/CSA through to the determination. On a recovery that starts with a walk of the space against the drawings and an honest list of what is missing.

B · WHAT SALIAN DOES NOT CONTROL
The determination, and a few other things

No contractor accredits a facility. The determination, the inspection schedule, and how the standard is applied to your specific space rest with the applicable Accrediting Official or Cognizant Security Authority. Salian also does not control your landlord, your funding, or a carrier's delivery date, though it will tell you plainly when one of those is the actual problem.

C · WHAT HAPPENS NEXT
A person reads it

If you send the picture, someone at Salian reads it rather than routing it. What comes back is what Salian would want to see next, usually the drawing set, the deficiency list and the record of coordination to date, and a straight view on whether the remaining work is weeks or quarters.

D · IF THE ANSWER IS NO
Some spaces cannot get there as they stand

A location, a lease, or a configuration sometimes cannot support the requirement without changes nobody will fund. Salian says so early and in writing rather than billing through a year of the alternative.

VI.SOURCES

Sources.

The standards this page describes, as published.

Standards are revised. Confirm the current version, and what your Cognizant Security Authority applies to your facility, before relying on anything summarised here.

VII.COMMON QUESTIONS

SCIF accreditation, answered.

What is SCIF accreditation?
SCIF accreditation is the formal approval of a facility to process, store, or discuss Sensitive Compartmented Information, granted by the cognizant Accrediting Official based on ICD-705, the Fixed Facility Checklist, and the body of evidence. Accreditation means the AO has determined the facility meets the physical and technical standards for the protection level it will host.
Who accredits a SCIF?
The cognizant Accrediting Official for the sponsoring program accredits the SCIF, within the authority of the Cognizant Security Authority. The contractor's security requirements flow from the contract and the DD-254. Salian Defense assembles the package and walks it through the AO directly rather than handing over a building and a wish of good luck.
What is the Fixed Facility Checklist?
The Fixed Facility Checklist records a SCIF's as-built characteristics against ICD-705: construction, intrusion detection, access control, acoustic protection, and any shielding. It is the core of the accreditation body of evidence and is assembled as the work proceeds, not reconstructed at the end.
When is TEMPEST or RF shielding required for accreditation?
TEMPEST countermeasures and RF shielding are required when the threat assessment and the program's requirements call for them, not on every facility. When required, the shielding is installed and verified by measurement against the specified attenuation, and the test results become part of the accreditation evidence.
What is co-use accreditation?
Co-use, or joint-use, accreditation lets more than one program or organization share an accredited SCIF under a documented agreement between the accrediting authorities. It avoids duplicate construction by allowing a second program to use existing accredited space, subject to the AOs' approval and a co-use memorandum.
Is a finished SCIF the same thing as a facility ready for accreditation?
No. Construction ends when the space is built. The accreditation submission ends when there is a record of how the space was built, tested and protected during construction: as-built drawings, a Fixed Facility Checklist, test results, product certifications, and the Construction Security Plan record. A facility can be complete and still be months from a submission the reviewing authority can act on.
What goes into an accreditation evidence package?
The Fixed Facility Checklist describing the as-built facility against ICD-705, the as-built drawing set, the Construction Security Plan and the record of what was done under it, intrusion detection and access control test results, acoustic verification, any TEMPEST or RF measurement reports where those requirements apply, product certifications for doors and hardware, commissioning documents, and a tracked list of unresolved deficiencies.
Can a contractor decide that a facility is accredited?
No. The applicable Accrediting Official or Cognizant Security Authority makes that determination. Any tool, checklist or report from a contractor describes readiness categories and open questions, and the accreditation determination remains with the applicable authority.
VIII.TALK TO SALIAN
/ NEXT STEP

Accreditation that holds, walked through with you.

Salian Defense does not hand over a binder and step back. We assemble the body of evidence, complete the Fixed Facility Checklist, and stay in the room for the inspection and AO sign-off, whether the space is a new build or an existing facility that needs to reach accreditation. If you are mid-project, start with the readiness check above and send the picture across. If you are earlier than that, the Scope intake is a short, unclassified set of questions that maps your path. Nothing classified is required for either.