Seven planning-level questions return a budgetary planning range for SCIF and secure-facility work, the answers of yours that are carrying the cost, and the method that produced the range. Built for security officers, ISSMs and program offices sizing a budget line before design money is committed.

›BEFORE YOU START

What this estimate is

  • A budgetary planning range for a described secure facility.
  • Enough to size a budget line, test affordability, or decide whether to pursue a build at all.
  • Produced from a published method you can read in full below the result.
  • Computed in your browser. Nothing is transmitted unless you choose to send it.

What it is not

  • A construction bid. A bid prices a drawn facility on a surveyed site.
  • An accreditation guarantee. The applicable Accrediting Official or Cognizant Security Authority accredits the facility.
  • A final engineering estimate. That follows design, survey and a named risk position.
  • A government determination of any kind.

Do not enter classified facility details. Planning-level inputs only.

›BUDGETARY RANGE INTAKE

Initializing intake …

I.WHAT MOVES THE NUMBER

Five answers, in the order they matter.

There is no honest flat price per square foot for accredited space. Two facilities of identical size can differ by a factor of three, and the reasons are predictable. These are the inputs the estimator weighs, and the ones worth pinning down before you commit to a budget line.

Cost drivers for ICD-705 accredited space
DriverWhy it moves the numberWhat tightens the range
Accreditation posture The protection level the requirement demands sets the construction standard, the detection, and the response expectations. It is the widest single swing in the model. The handling requirement, confirmed with the AO/CSA rather than assumed.
Starting posture A new build, a retrofit of existing space and an expansion are three different jobs. A retrofit inherits whatever the previous team did or failed to do, and a fully built interior has to be undone before it can be rebuilt. An honest assessment of what exists today, including any prior accreditation attempt.
RF and acoustic requirements Shielding is the largest of the additive items. The attenuation your accreditation requires determines the construction method, and the gap between a modest acoustic requirement and a full RF-shielded enclosure is large. The attenuation standard, if the AO/CSA has named one. Not every facility needs shielding at all.
Usable secure square footage Scales the whole envelope. Fixed costs such as perimeter, entry control and mechanical penetrations amortize across larger spaces, so the rate per square foot is not constant. Secure square footage separated from total leased or owned area.
Region and schedule Cleared labour is a thin market and its depth varies sharply by metro. Compressing a schedule buys overtime, parallel trades and expedited material on top of that. The metro, and a required occupancy date with whether it is contractual or aspirational.

The estimator names which of your answers is carrying the cost rather than repeating this list. For a firm figure, write us directly or start with the readiness check.

II.WHY ESTIMATES DIVERGE FROM BIDS

The four gaps between a range and a price.

A budgetary range prices a facility as described. A bid prices a facility as drawn, on a surveyed site, in a named market, on a named date. Those are different objects, and the distance between them is almost always one of these four things.

An estimate that lands far from a bid is usually not a broken model. It is one of these four facts arriving late. Pinning them down early is worth more than a tighter estimate.

III.WHAT SALIAN DOES, AND DOES NOT CONTROL

We scope, design, build, prepare and coordinate.

Salian Defense scopes secure facilities, then delivers them: ICD-705 design, construction, preparation for accreditation and sustainment under one accountable team, with the accreditation package prepared as the work happens and coordinated with the AO/CSA. Where the blocker is a facility clearance rather than a building, Salian helps you identify and prepare for the sponsorship path.

This estimator is powered by Vates Cognition, the secure facility scoping, cost and compliance engine in the Praesidium Suite. The arithmetic behind the range is described in full under the result above.

The applicable Accrediting Official or Cognizant Security Authority accredits the facility. DCSA or the applicable Cognizant Security Agency determines facility clearances, the Authorizing Official authorizes systems, and licensed architects and engineers seal what the law requires them to seal. This estimator is planning support and is not a determination by any of them.

IV.WHAT HAPPENS NEXT
V.COMMON QUESTIONS

The estimator, answered.

What is a budgetary planning range?
A planning-grade cost band produced before design, used to size a budget line or test whether a program is affordable at all. It is not a bid, a quote or a firm price, and it carries a wide band by design. The band narrows as the seven project inputs are answered, because unanswered questions are filled with mid-range assumptions and those assumptions are the uncertainty.
Why is the estimate a range instead of a number?
Because a single figure would be a fiction at this level of information. Before a site survey and a design, the honest output is a band. Anyone quoting a precise figure from seven answers is either guessing or selling. The midpoint is computed inside the model and deliberately never shown on its own.
Why do estimates diverge from construction bids?
A budgetary range prices a described facility. A bid prices a drawn facility on a surveyed site, in a specific market, on a specific date, with named subcontractors and a named risk position. The gaps are usually site conditions found during survey, requirements named by the accrediting authority after the estimate, scope added during design, and market movement between the estimate and the award.
What drives the cost of a secure facility the most?
Five answers move the number more than anything else: usable secure square footage, the accreditation posture the requirement demands, starting posture, RF and acoustic requirements, and region with its cleared-labour market. Schedule compression sits behind those. See what a SCIF costs for the longer treatment.
Do I have to give an email to see the estimate?
No. The range is produced in your browser as you answer, and nothing is transmitted. Sending the scope to Salian Defense is a separate, optional step below the result that needs a work email, a CAGE code and an explicit consent check. The CAGE code routes the enquiry; it does not change the range.
What must not be entered into this estimator?
Do not enter classified facility details. Planning-level inputs only. The estimator does not ask for and must not receive classified information, controlled unclassified information, or the specifics of a fielded accredited facility such as its address or accredited configuration. That boundary is a design constraint, not a policy note added later.
VI.SOURCES

What the cost drivers trace to.

The drivers in this model are the requirement categories that the governing documents for accredited space impose on construction. What a specific facility must meet comes from the applicable AO/CSA, not from this page.

The rates behind the model are Salian's own, drawn from its secure-construction work, and are refreshed periodically. They are not a published index and are not a quote.

VII.TALK TO SALIAN
/ NEXT STEP

A range is a starting point, not an answer.

When the band is close enough to act on, the next step is a survey and a scope, not a tighter estimate. Tell us what you are trying to accomplish and we will tell you what it actually takes.